| Type of Project |
: |
Dispatching Experts |
| Field |
: |
Basic Public Services/Facilities |
| Name of Local Authority |
: |
Tottori Prefecture |
| Cooperative Partner |
: |
Tuv Aimag Mongolia |
- Motive for the start of project:
-
We exchanged a memorandum of friendly relations with each other in 1997, and we have been asked to assist in the repairing of wells.
- Outline and Progress of Project:
-
| 1998 |
May and August, Investigated the condition of the wells and irrigaiton systems in farm fields |
| 1999 |
May, investigation of the construction site
(take measurements)
August, (present state)
September, begin construction |
- Cooperation Period:
- 1998 - 2001
- Affiliations with other Organizations:
-
Tuv Aimag (cooperation project between the two prefectures)
Tuv Aimag is responsible:
- To organize the people, such as specialists from a well-building company, that are necessary for the construction
- To build a protective structure around the well and to establish a management system among the well-users
- Expenses:
-
1998 630,000 yen
1999 5,333,000 yen
- Difficulties and Solutions:
- None in particular
- Difficulties and Solutions:
- To prevent the well from freezing during the winter, the protective structure will be made so that water can be drained.
- Results and Future Prospects:
- Tuv Aimag will repair the prefecture's wells itself; the repaired wells will assure drinking water and water for livestock; the irrigation system will be improved, which will further develop agriculture in Tuv Aimag
- Problems:
-
there are many wells that are no longer functional, and it is believed that lots of funds will be needed
- Message:
-
equipment for the projects
- deep well water pump
- hand pump
- irrigation pump for farm fields
- Department in charge:
-
International Affairs Division, General Affairs Department, Tottori Prefecture
- Updated On:
-
August, 2001
|